HRAI: Pilot Residential Ventilation using CSA F326:23 (Oct 29 to Oct 31)

Format: 3-day, Online Virtual

Dates: October 29 to 31, 2025

Time: 8:30 AM – 4:30 PM CST

Participants will use extensive worksheets in conjunction with detailed procedures to select equipment, size ducts, and specify installation and control details necessary to design ventilation systems that satisfy building code requirements throughout Canada based on the CAN/CSA F326-M1991 (R2014).

This Standard offers significantly greater flexibility and has no scope restrictions compared to local building codes. 

Res. Ventilation using CAN/CSA F326-M1991 (R2014) - 25/26



Provided By: HRAI